Site Preparation Checklist |
|
|
|
|
|
To assure more timely
scheduling, please review the following prior to making
|
|
|
the
arrangements for the field measurement and the installation. If you have
|
|
|
questions
please call. Some items below may not apply to your project. |
|
|
___ Base cabinets
permanently installed and leveled |
|
|
____Sub tops, corbels and supports installed; shapes ready for
templates |
|
|
____Sub tops should be of ¾” plywood; NO particle board. |
|
|
____Opening cut for sinks, cook surfaces, downdraft, etc.
|
|
|
____Under mount sink openings routed, faucet holes, air gap,
etc
|
|
|
____Sinks and templates at site for verification |
|
|
____Cook tops or ranges at site with specifications for
verification |
|
|
____Don’t install trim on Sub-tops before the granite has been installed. |
|
|
____Any or all openings or notches
detailed |
|
|
____Appliance garages removed or set well above sub tops
|
|
|
____Installed appliances removed (where affected)
|
|
|
____For backsplash: outlet bottoms at 6 inches off sub top
|
|
|
____For full height backsplash, upper cabinets must also be
installed. |
|
|
|
|
|
____Provide directions or map to your job site |
|
|
____Make scheduling
arrangements with Jeff at 360-671-6117 |
|
|
____Make measurement arrangements with Dave at same phone
# |
|
|
____Make contract and stone changes with Judy at same phone # |
|
|
|
|
|
Please make sure the above list has
been completed. |
|
|
A trip charge will be assessed for
returns. |
|
|
|
|
|
During the installation, we would
like the homeowner or contractor present |
|
|
at the beginning
to answer any questions about the placement of the granite, |
|
|
faucet
holes, cook top openings, etc. At the completion of installation, we |
|
|
would like
someone present to sign an “ Acceptance of Delivery ” and make the |
|
|
final payment. |
|
|
Thank you for choosing StonWest for your
project! |
|
|
|